Gemini Community Support Site

This Gemini community support site can be used to find solutions to product issues. You can log in using Open Id, Google Profile and even Facebook. Feel free to ask a question or browse FAQs and documentation. Product tour videos are also available along with how-to videos demonstrating key Gemini capabilities.




Index Item Management
Previous  |  Next

 1      Installing Gemini 5
 1.1        Pre-requisite Checks
 1.2        Installing Gemini 5 Using Automated Installer
 1.3        Installing Gemini 5 Using Zip File
 1.4        Upgrading 5.0 to 5.1
 1.5        Upgrading 4.2 to 5.1
 1.6        Using Windows Authentication
 1.7        Setting up with Geckoboard
 1.8        Setting up with Lucidchart
 1.9        MS Project Connector
 2      Getting Started with Gemini 5
 2.1        Signing in to Gemini
 2.2        Navigation in Gemini
 2.3        AppNav Cards
 2.4        Gemini Terminology
 2.5        Features and Functions
 2.5.1          The Grid
 2.5.2          The Planner
 2.5.3          Activity Page
 2.5.4          Timeline Page
 2.5.5          Roadmaps and Changelogs
 2.5.6          Documents
 2.5.7          Standard Reports
 2.5.8          The Calendar
 2.5.9          Burndown and Burnup Charts
 2.5.10           Ad Hoc Reporting with Excel
 2.5.11           The Data Import Wizard
 3      Creating and Managing Tasks
 3.1        Creating Tasks
 3.2        Rapid Planning (Creating Multiple Tasks)
 3.3        The View Item Page
 4      Structuring Projects
 4.1        Creating Projects
 4.2        Components in Gemini
 4.3        Versions in Gemini
 4.4        Setting Project Defaults
 5      Breeze - Email-to-ticketing
 5.1        Introduction to Breeze
 5.2        Breeze: Queues
 5.3        Breeze: SMTP Servers
 5.4        Breeze: Mailboxes
 5.5        Breeze: Response Templates
 6      Sentry - Testing in Gemini
 6.1        Introduction to Sentry
 6.2        Test Cases
 6.3        Test Plans
 6.4        Test Runner (Executing Tests)
 6.5        Test Run History
 7      Project Templates
 7.1        Project Templates: Introduction
 7.2        Project Templates: Process
 7.3        Project Templates: Screens and Visibility
 7.4        Project Templates: Process Workflow
 7.5        Project Templates: Custom Fields
 7.6        Project Templates: Menus
 7.7        Project Templates: Status, Priority and Severity
 7.8        Project Templates: Resolution
 7.9        Project Templates: Links
 7.10         Project Templates: Time
 8      People and Permissions
 8.1        Users
 8.2        Groups
 8.3        Permissions
 8.4        Active Directory Integration and Windows Authentication
 9      Code Review & Source Control Connectors
 9.1        SVN Server Installation
 9.2        Client Side Gemini Tortoise SVN Integration
 9.3        Git Source Control Connector
 9.4        Mercurial Source Control Connector
 9.5        TFS Source Control Connector
 9.6        Using Saucery for Code Review
 10       Gemini 4
 10.1         Getting Started
 10.2         Installing
 10.2.1           Requirements
 10.2.2           Automated Installer
 10.2.3           Microsoft Web Platform
 10.2.4           Zip File
 10.2.5           Scheduler Service
 10.3         Upgrading
 10.3.1           Upgrading Existing Installations
 10.3.2           Upgrading 4.1.x to 4.2
 10.3.3           Upgrading 4.0.x to 4.2
 10.3.4           Upgrading 3.7.x to 4.2
 10.3.5           Upgrading 3.6.x to 4.2
 10.3.6           Upgrading 3.5.x to 4.2
 10.3.7           Upgrading 3.1.x to 4.2
 10.3.8           Upgrading 3.0.x to 4.2
 10.3.9           Upgrading 3.0.0 to 4.2
 10.3.10            Upgrading 2.2 to 4.2
 10.3.11            Upgrading 2.1.x to 4.2
 10.3.12            Upgrading 2.0.x to 4.2
 10.3.13            Upgrading 1.9.1 to 4.2
 10.3.14            Upgrading 1.9/1.9a/1.9b to 4.2
 10.3.15            Upgrading 1.8.x to 4.2
 10.3.16            Upgrading 1.7 to 4.2
 10.3.17            Upgrading 1.6.3 to 4.2
 10.4         Projects
 10.4.1           Project Concepts
 10.4.1.1             Grouping Projects
 10.4.1.2             Components
 10.4.1.3             Versions
 10.4.1.4             Roadmap
 10.4.1.5             Change Log
 10.4.1.6             Dashboard
 10.4.2           Project Customization
 10.4.2.1             Project Settings
 10.4.2.2             Single, Multiple Item Options
 10.4.2.3             Item Type, Priority, Severity Options
 10.4.2.4             Default Values
 10.4.2.5             Components
 10.4.2.6             Versions
 10.4.2.7             Project Attributes
 10.4.2.8             Which Fields Are Displayed?
 10.5         Item Management
 10.5.1           Overview
 10.5.2           Creating
 10.5.3           Editing
 10.5.4           Viewing
 10.5.5           Visibility
 10.5.6           Custom Fields
 10.5.7           Comments
 10.5.8           Hierarchy
 10.5.9           Links
 10.5.10            Recurrence
 10.5.11            Estimates & Time Logs
 10.5.12            Source Control Links
 10.5.13            Audit Trails
 10.5.14            Workflow
 10.5.15            Filter Items
 10.5.15.1              Using the Filter
 10.5.15.2              Saving and Reusing Filters
 10.5.15.3              Cross Project Roll-ups
 10.5.16            Patterns
 10.6         Planning Board
 10.7         Time Management
 10.7.1           Time Reports
 10.7.2           Recording Time
 10.8         Notifications
 10.8.1           Project Alerts
 10.8.2           Item Watchers
 10.9         Test Management
 10.9.1           Approach
 10.9.2           Plans
 10.9.3           Cases
 10.9.4           Runs
 10.9.5           Traceability
 10.9.6           Filtering
 10.10          Management
 10.10.1            Administration
 10.10.1.1              General Configuration
 10.10.1.2              SMTP and Notifications
 10.10.1.3              Projects
 10.10.1.4              Custom Fields
 10.10.1.5              Item Management
 10.10.1.6              Test Management
 10.10.1.7              Licensing
 10.10.2            Users & Security
 10.10.2.1              User Management
 10.10.2.2              Global and Project Groups
 10.10.2.3              Working with Global Groups
 10.10.2.4              Working with Project Groups
 10.10.2.5              Available Permissions
 10.10.2.6              Project Resources
 10.10.2.7              Assigning Permissions to Projects
 10.10.2.8              Windows Authentication
 10.10.2.9              Active Directory Integration
 10.11          Using Add-on Products
 10.11.1            Visual Studio 2008/2010
 10.11.2            Gemini Desktop
 10.11.3            Microsoft Outlook
 10.11.4            Converse
 10.11.4.1              Installation
 10.11.4.2              Core Mailbox Setup
 10.11.4.3              Selecting Emails to Process
 10.11.4.4              Manipulating Email Content
 10.11.4.5              Outbound Notifications
 10.11.4.6              Project Mapping
 10.12          API
 10.12.1            Introduction
 10.12.2            Enabling API support
 10.12.3            Authentication
 10.12.4            Response Formats
 10.12.5            .NET Quick-start
 10.12.6            Schema Reference
 10.12.7            Administration API
 10.12.8            Alerts API
 10.12.9            Custom Fields API
 10.12.10             Groups API
 10.12.11             Items API
 10.12.12             Projects API
 10.12.13             Users API
 10.12.14             Testing API
 10.13          User Profile
View  |  Print  |  PDF

194 documents found.


Item Management

admin
items

An item in Gemini represents something that can be assigned to a resource (or resources) that requires effort to complete it. An item can represent a Bug, Task, Enhancement, Requirement, Change Report, Support Ticket, Investigation or anything you wish. Gemini allows for different meta data to be attached to items even in different projects with full control over the definition of item associated meta-data. The following represents a typical view of an item and it’s associated meta data:

image

Such customizations can only be performed by Gemini Administrators. Here are the full customization options at the item level.

image

General Options

 

image

The Time in Working Day option represents the hours:minutes in your typical working day.

You can also choose between rich text editing or plain text for Item Descriptions and Item Comments.

The Item Link Qualifier is used to automatically turn text such as “GEM:995” into a hyperlink to the item itself (e.g. GEM:995).

The Show Images option can be used to show/hide item type, priority, severity and status images such as follows:

image

Item Types

Gemini Administrators can introduce their own Item Types with relevant imagery.

image

Every Item in Gemini must have an Item Type (e.g. Bug, Enhancement, Task).

Item Types can be organized into groups that can subsequently be allocated to different projects.

image

This ensures that only relevant, applicable meta-data is applied to each project – this is what Countersoft terms “Relevant Project Experience”.

Furthermore, every Item Type can have it’s own Screen definitions that determine who sees what field and when. Furthermore, an Item Type can also have it’s own workflow (that overrides the containing Project’s workflow).

image

Item Priority

Gemini Administrators can introduce their own Item Priority with relevant imagery.

image

Every Item in Gemini can have an Item Priority (e.g. Low, Medium, High) that determines when an Item should be scheduled/addressed.

Item Priority values can be organized into groups that can subsequently be allocated to different projects.

image

Item Severity

Gemini Administrators can introduce their own Item Priority with relevant imagery.

image

Every Item in Gemini can have an Item Severity (e.g. Trivial, Minor, Major) that determines the actual impact of an Item.

Item Severity values can be organized into groups that can subsequently be allocated to different projects.

image

Item Status & Workflow

Typically an Item will transition from “creation” to “closure” during it’s life-time.  Those transitions are represented by Item Status values that an Item may flow through. For example, a Task may flow as follows:

  • Unassigned
  • Assigned
  • In Progress
  • Closed

The following default Item Status values ship with Gemini which Gemini Administrators can customize as required.

image

Once you have defined the potential list of Item Status values, assemble them into an Item Workflow that can be attached to either a Project or an Item Type.

image

Essentially, you define which Item Status values can participate in the workflow and then edit each one and set it’s transitions as required.

image

Note how you can select the outbound transitions AND specify who user groups can set them.

Item Resolution

An Item’s Resolution determines it’s final outcome. Did we fix it? Was it duplicate request? Did we put it on hold?

Resolution values apply across all projects.

image

Item Link Types

Every Item can be linked to another – not in terms of workflow – but in terms of referential information such as “these two items are duplicates”.

image

Gemini Administrators can define customize Link Types with appropriate descriptions.

image

Item Time Types

Users can specify the type of time they are logging. Define your own time types to help gain better insight into the type of work being performed by project resources.

image

Item Screens

A Bug can have a different input fields from a Change Request. Furthermore, the Bug editing experience can be different from when raising a new Bug.

You can define different screens for creating, viewing, editing and even commenting stage. First define your screen:

image

Now edit the screen and select who can see which fields – including Custom Fields.

image

Once defined, simply attach the screen definition to the appropriate stage:

image


Previous  |  Next