Home Home
  login

Gemini Community Support Site

This Gemini community support site can be used to find solutions to product issues. You can log in using Open Id, Google Profile and even Facebook. Feel free to ask a question or browse FAQs and documentation. Product tour videos are also available along with how-to videos demonstrating key Gemini capabilities.




Index Standard Reports
Previous  |  Next

 2.5        Features and Functions
usage
 2.5.1          The Grid
usage
Excel
 2.5.2          The Planner
usage
 2.5.3          Activity Page
usage
time
 2.5.4          Timeline Page
usage
time
 2.5.5          Roadmaps and Changelogs
usage
time
 2.5.6          Documents
admin
usage
projects
 2.5.7          Standard Reports
usage
projects
reporting
 2.5.8          The Calendar
usage
projects
add-ons
time
plugins
ms-outlook
 2.5.9          Burndown and Burnup Charts
usage
time
reporting
 2.5.10           Ad Hoc Reporting with Excel
reporting
Excel
 2.5.11           The Data Import Wizard
admin
database
templates
Excel
migration
View  |  Print  |  PDF

12 documents found.


Standard Reports

usage
projects
reporting

Gemini ships with a range of standard reports, including:

  • Group By Reports
  • Time Report - Project
  • Time Report – Mine (logged in user’s time entries)
  • Activity By Component
  • Activity By Type
  • Activity By Priority
  • Activity By Resource
  • Activity By Severity
  • Activity By Version
  • Summary By Component
  • Summary By Type
  • Summary By Version
  • Resource Allocation
  • Project Summary

All of these reports are graphical, many with hyperlinks to the data that makes up the relevant report summaries.

The drop down selector on the right hand side of the page, lets you choose which of these reports to run. Different reports will prompt for different parameters. Time reports for example will prompt for a date range, other reports may prompt for the type of measure to display – a count of items or a number of hours for example. Whatever report is selected, Gemini always allows cross-project reporting through the Project Selector. This control shows a drop-down list of all of the projects to which you have access and you can choose to report on data from multiple projects simultaneously.

 Project Selector

Fig 1.0 Project Selector  in Reporting

Group By Reports

Group By reports have specific characteristics in that they represent a variety of ways to slice and dice your data and their data scope selection is different from other reports. The annotated screen shot below helps to illustrate this flexibility.

Group By Report

Fig 2.0 Group By report showing a component breakdown for the AppNav card “Filter Items”.

 As the image above illustrates, the Group By report checks to see if there is an AppNav card that points to the Grid. If so, the Group By report takes its data scope from the card. If you wish you can change the scope so that it defaults back to all data in whatever projects are selected using the Project Selector.

If you pin the Report and create an AppNav card then Gemini will pin the specific report and its parameters.


Previous  |  Next